My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2947
>
2200 - Hazardous Waste Program
>
PR0505986
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:55:45 AM
Creation date
6/26/2020 10:06:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505986
PE
2247
FACILITY_ID
FA0005785
FACILITY_NAME
SFPP LP (STOCKTON TERMINAL)
STREET_NUMBER
2947
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
CURRENT_STATUS
01
SITE_LOCATION
2947 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Impact of Major Spills on SPCC Regulations Food for thought... <br /> • Exxon Valdez,1989: <br /> — 11 million gallons of crude oil spilled into Prince William Sound, • A spill of only one gallon of oil can <br /> Alaska <br /> — Damaged ecosystems and impacted fishing industry contaminate a mi//ion gallons of water <br /> — led to Oil Pollution Act of 1990 which expanded prevention, • Costs associated with spill prevention are <br /> preparedness and response activities,required FRPs(Section 8 <br /> of the KM Integrated Contingency Plan) usually much less than the cost of spill <br /> t cleanup, fines, other civil liabilities <br /> 13 14 <br /> Kinder Morgan SPCC Plan Purpose/Objectives <br /> SPCC Plan Format <br /> Sections in SPCC Plans: The Plan objectives are to define the spill prevention, <br /> • 1—Introduction&General Information control,and countermeasures for the Facility and to assist <br /> • 2—Notification&Response Procedures personnel with maintaining efficient and effective program. <br /> • 3—Training&Inspection Programs The Plan components to meet the objectives are: <br /> • 4—Facility Drainage —Spill prevention equipment listings and procedures <br /> • 5—Bulk Storage Containers —Required inspections&records <br /> —Facility drainage <br /> • 6—Transfers,Pumping,&In-Plant Process Operations —Security <br /> • 7—Tank Car and Truck Loading/Unloading —Training <br /> • 8—Security <br /> 16 <br /> 15 16 <br /> SPCC Plan Review & Amendments <br /> Review&Amendment Requirements <br /> • A Plan must be revised when changes in design, <br /> construction,operation,or maintenance affect <br /> the potential for discharge of oil to waters of the <br /> US. <br /> • Revisions must be: y - <br /> -Prepared(put into Plan)within 6 months of a <br /> change in one of the above. —77 <br /> —Implemented ASAP,but no later than 6 months =` <br /> after Plan revision prepared. <br /> —Reviewed by Plan holders and logged on the <br /> designated document in the Plan. <br /> • Five-year management review <br /> 17 18 <br /> 17 18 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.