Laserfiche WebLink
Notification & Response Procedures Notification & Response Procedures <br /> (cont.) <br /> • Internal & External Notifications • Countermeasures&Response Procedures - <br /> *For California Facilities use CA Notification Initial Response Actions Summary <br /> Guidelines -Safety(personnel&public)is first priority <br /> -Eliminate sources of ignition <br /> *For Non CA facilities follow guidelines in -Isolate the source of discharge <br /> ICP -Make notifications <br /> •Initial Reporting Details Form&instructions -Activate response as necessary <br /> are contained in Section 2 as Figure 2.2 -Activate response contractors as necessary <br /> -Monitor&control containment&cleanup <br /> 9 20 <br /> 19 20 <br /> Site Drawing Training <br /> • The facility SPCC Plan must have a site drawing <br /> • Initial training given to oil-handling personnel: <br /> - general facility operations; <br /> showing aboveground storage(>_55 gal. — operation and maintenance of equipment; <br /> capacity),transfer areas and drainage. Also, — spill prevention and response procedures; <br /> exempt(from SPCC) USTs(those subject to UST — facility SPCC plan contents and applicable laws,rules, <br /> regulations 40 CFR 280 or 281)must be shown regulations; <br /> on drawings. — training methods include hands-on,classroom,CBTs,manual <br /> • If there is a significant spill at the loading rack, review,safety meetings,spill drills,HAZWOPER <br /> how do we ensure the product does not leave • Annual refresher training <br /> the facility? — If personnel are unable to attend classroom training,they should <br /> review copy of this presentation and facility's SPCC plan. <br /> 21 22 <br /> 21 22 <br /> Spill Prevention Annual Briefings Inspections <br /> • Review recent release incidents, potential • Engineering Dept. Tank Group oversees <br /> releases, component failures, newly tank integrity testing program, and <br /> developed spill control methods or quarterly and/or semi-annual inspections <br /> precautionary measures implemented associated with air compliance regulations. <br /> • Field personnel conduct daily site walk- <br /> through, monthly inspections (Form LOM <br /> 2100-02). <br /> • Inspections should include: <br /> 23 24 <br /> 4 <br />