My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2947
>
2200 - Hazardous Waste Program
>
PR0505986
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:55:45 AM
Creation date
6/26/2020 10:06:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505986
PE
2247
FACILITY_ID
FA0005785
FACILITY_NAME
SFPP LP (STOCKTON TERMINAL)
STREET_NUMBER
2947
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
CURRENT_STATUS
01
SITE_LOCATION
2947 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notification & Response Procedures Notification & Response Procedures <br /> (cont.) <br /> • Internal & External Notifications • Countermeasures&Response Procedures - <br /> *For California Facilities use CA Notification Initial Response Actions Summary <br /> Guidelines -Safety(personnel&public)is first priority <br /> -Eliminate sources of ignition <br /> *For Non CA facilities follow guidelines in -Isolate the source of discharge <br /> ICP -Make notifications <br /> •Initial Reporting Details Form&instructions -Activate response as necessary <br /> are contained in Section 2 as Figure 2.2 -Activate response contractors as necessary <br /> -Monitor&control containment&cleanup <br /> 9 20 <br /> 19 20 <br /> Site Drawing Training <br /> • The facility SPCC Plan must have a site drawing <br /> • Initial training given to oil-handling personnel: <br /> - general facility operations; <br /> showing aboveground storage(>_55 gal. — operation and maintenance of equipment; <br /> capacity),transfer areas and drainage. Also, — spill prevention and response procedures; <br /> exempt(from SPCC) USTs(those subject to UST — facility SPCC plan contents and applicable laws,rules, <br /> regulations 40 CFR 280 or 281)must be shown regulations; <br /> on drawings. — training methods include hands-on,classroom,CBTs,manual <br /> • If there is a significant spill at the loading rack, review,safety meetings,spill drills,HAZWOPER <br /> how do we ensure the product does not leave • Annual refresher training <br /> the facility? — If personnel are unable to attend classroom training,they should <br /> review copy of this presentation and facility's SPCC plan. <br /> 21 22 <br /> 21 22 <br /> Spill Prevention Annual Briefings Inspections <br /> • Review recent release incidents, potential • Engineering Dept. Tank Group oversees <br /> releases, component failures, newly tank integrity testing program, and <br /> developed spill control methods or quarterly and/or semi-annual inspections <br /> precautionary measures implemented associated with air compliance regulations. <br /> • Field personnel conduct daily site walk- <br /> through, monthly inspections (Form LOM <br /> 2100-02). <br /> • Inspections should include: <br /> 23 24 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.