My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2947
>
2200 - Hazardous Waste Program
>
PR0505986
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:55:45 AM
Creation date
6/26/2020 10:06:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505986
PE
2247
FACILITY_ID
FA0005785
FACILITY_NAME
SFPP LP (STOCKTON TERMINAL)
STREET_NUMBER
2947
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
CURRENT_STATUS
01
SITE_LOCATION
2947 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> b <br /> 31 32 <br /> Bulk Storage Containers Transfer Operations, Pumping, & <br /> In-plant Processes <br /> • Aboveground Bulk Container Design, <br /> Construction,&Engineering Features: • Buried Piping <br /> — Wrapped and coated <br /> —Compatible material — Cathodically-protected <br /> -Safe-fill level below operating capacity • Out-of-Service or Extended Standby Service Piping <br /> -Liquid level sensors and alarms that are audible& - capped or blank-flanged and marked <br /> visual(in control rooms)with battery backup power • Aboveground Equipment Protection from Vehicles <br /> supply — Warnings,speed signs,bumper guards <br /> —Secondary containment A< — Vehicles confined to facility roads and parking areas,except in <br /> special circumstances which require additional safety training <br /> -Cathodic protection , <br /> -Underground leak detection �� <br /> -Operating Procedures <br /> 1 3 36 <br /> 33 34 <br /> Additional Programs & Procedures SPCC Plan - Tank Car/Truck Loading <br /> and Unloading <br /> • Driver and employee training in loading/unloading <br /> • Follow existing procedures to avoid policies and procedures <br /> overpressure situations (LOM 260; • Signs for loading procedures&warnings <br /> LOTO) • Authorized personnel&trained drivers only allowed <br /> entrance to loading racks <br /> • Use prevention measures to avoid a closed • ESD stations at the loading racks(Are these tested?How <br /> valve situation often?) <br /> • Secondary containment at truck loading racks(Are there <br /> •At least one pipe/component inspections cracks in concrete slabs/curbs?) <br /> per shift • Facility containment for transfer areas <br /> • Premature vehicular departure prevention measures at <br /> racks typically include interlocked warning lights,brake <br /> interlock systems,and warning signs 36 <br /> 35 36 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.