Laserfiche WebLink
Inspections (cont.) Inspections (cont.) <br /> • Check for leaks and stains <br /> • Check for shell distortions • UI E ment Inspections—Containers <br /> • Check for signs ofsettlement q p p <br /> • Check for corrosion , Drums <br /> • Check condition of foundation <br /> • Check paint coatings —certified by manufacturers as meeting US <br /> • Check insulation system,ifapplicable DOT specifications and standards <br /> • Check appurtenances <br /> • Hand gauge tanks —visually inspected at least monthly by facility <br /> • Compare side gauge to tank monitoring system personnel <br /> • Check leak detection,if applicable kept from round contact as much as possible <br /> • Check redundant high level alarm - p g <br /> • Check tank pads for erosion —Labels(for identification&hazards) intact and <br /> • For DOT Tanks,inspector must beOQV in good condition <br /> • Maintain Record of Inspection for possible DOT Inspection <br /> 26 26 <br /> 25 26 <br /> Inspections (cont.) Inspections (cont.) <br /> • Equipment Inspections and Tests • Equipment Inspections and Tests- <br /> -Aboveground Piping,Valves,etc. Documentation <br /> •visually checked during daily rounds —Inspection and test records are maintained on <br /> file at least 3 years. <br /> —Buried Piping —All training and quarterly safety&annual <br /> •integrity and leak tested at installation, abnormal operations meetings are to be <br /> modification,relocation,or replacement documented and maintained on site. <br /> •cathodically-protected with annual inspection by Document SPCC topics discussed.The typical <br /> corrosion specialist required duration is 5 years plus current year. <br /> 27 28 <br /> 27 28 <br /> Facility Drainage Facility Drainage (cont.) <br /> • Product Tank Secondary Containment Storm <br /> • Diked Storage Areas Water Drainage Procedures: <br /> -Drainage is controlled by manually-controlled valves - Water is visually inspected for product sheen or other evidence <br /> which are locked in closed position unless draining of contamination. <br /> storm water from diked areas. - If there is any product sheen or other contamination,then water <br /> -Accumulated storm water that does not dissipate may not be discharged and must be pumped or vacuumed out <br /> naturally is removed in accordance with the and properly managed. <br /> stormwater drainage procedures(Section 4.3 in - If there is no evidence of product sheen or other contamination, <br /> Plan). then the dike drainage valve may be opened to allow gravity <br /> drainage of the storm water. <br /> • Undiked Process Areas - Documentation is Required! The date and time of the opening <br /> and the closing of dike drainage valve must be recorded on the <br /> -Drainage is controlled by curbing or other means to drainage log,along with name of person conducting the <br /> contain potentially contaminated storm water onsite. drainage and their verification of the condition of the water. <br /> Contained storm water Is conveyed to the facility - Must also follow requirements of storm water permit/SWPPP,if <br /> waste water management system,naturally applicable. <br /> dissipated,or otherwise properly managed. - Dike area drainage must be conducted during daylight hours <br /> only,except for in an emergency situation. <br /> 29 30 <br /> 29 30 <br /> 5 <br />