Laserfiche WebLink
BMP Examples BMP Examples <br /> am <br /> 55 56 <br /> er New I - <br /> - _l <br /> (cont.) -- <br /> •Inspections: <br /> •Non-storm water discharge inspections and BMP <br /> maintenance inspections required monthly during <br /> daylight hours on dry days <br /> •Storm water inspections must be completed during all -- <br /> storm water sampling events,at the time sampling <br /> occurs --- <br /> •Annual comprehensive site compliance evaluation <br /> 5] 58 <br /> 57 58 <br /> tormwater Discharge�M <br /> 0 it 0 <br /> 59 <br /> 59 60 <br /> 10 <br />