My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2947
>
2200 - Hazardous Waste Program
>
PR0505986
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:55:45 AM
Creation date
6/26/2020 10:06:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505986
PE
2247
FACILITY_ID
FA0005785
FACILITY_NAME
SFPP LP (STOCKTON TERMINAL)
STREET_NUMBER
2947
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
CURRENT_STATUS
01
SITE_LOCATION
2947 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equirements Under New IG Requirements Un�( r New IGP <br /> cont.) (cont.) <br /> • Sampling: •Numeric Action Levels(NALs): <br /> • Qualifying storm event defined as one producing discharge from at <br /> least one drainage area,and preceded by 48 hours with no discharge •Results of required sampling will be compared to two <br /> from any area types of NALs: <br /> • Four QSEs must be sampled;two during first half of reporting year <br /> Oul 1-Dec 31),and two <br /> Zed; <br /> second half Oan Oun 30);best to •Annual NAL exceedance occurs when the average of <br /> sample first two discharges(luring each period to avoid missed all analytical results for all samples collected during a <br /> opportunities <br /> • Monitoring Implementation Plan(MIP;formerly Storm water reporting year for a given parameter exceeds annual <br /> Monitoring Plan)incorporated into SWPPP NAL value <br /> • Required sampling parameters include PH(field measurement), <br /> Oil&Grease,TSS,any pollutant on 303(d)list for receiving water Instantaneous NAL exceedance occurs if two or more <br /> body that could potentially be discharged,and any other pollutant analytical results from samples taken for any <br /> of concern determined by discharger <br /> • Samples must be collected within the first four hours of the start of parameter during a reporting year exceed <br /> discharge,or within four hours of facility opening and within 12 instantaneous NAL values <br /> hours of discharge <br /> 61 62 <br /> 61 62 <br /> - <br /> (cont.) cont.) <br /> •Exceedance Response Actions: •Reporting: <br /> •If facility exceeds an annual or instantaneous NAL, •Laboratory results must be submitted in SMARTS <br /> status changes from Baseline to Level 1 within 3o days of receiving all of the results for each <br /> •If facility exceeds an annual or instantaneous NAL for sampling event <br /> the same parameter while in Level 1,status changes to •Annual report due July 15 which includes a compliance <br /> Level 2 checklist for the reporting year,explanations for any <br /> •Each level requires escalated response actions,including requirements that were not completed,identification of <br /> BMP evaluations,action plans,and technical reports all SWPPP revisions made during year,and the date of <br /> prepared by a Qualified Industrial Storm Water <br /> Practitioner(QISP) the annual evaluation <br /> •Dischargers that enter Level 1 status must ensure a QISP •On July 1,all analytical results submitted to date will be <br /> provides adequate training to appropriate team considered to determine compliance level(baseline, <br /> members Level 1,Level 2) <br /> 63 64 <br /> 63 64 <br /> 7 -- - — iTcy�s p - <br /> Administrative Procedures EHS Assessments Findings <br /> will review Plan for conformance with •Inspections/observations not completed,or completed <br /> reguations and site-specific conditions and/or documented incorrectly <br /> •Plan reviewed on ongoing basis,and when changes in •Samples not collected,or collected incorrectly <br /> facility design or operation warrant •Site plans missing regulated areas,pollutant sources <br /> •Plan revised when changes in construction,operation, •Inadequate housekeeping,preventative maintenance <br /> maintenance occur which may affect storm water <br /> pollution potential,or when Plan has not met general <br /> objectives <br /> 65 66 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.