Laserfiche WebLink
1.0 Introduction Version :27.10.4 <br /> 1.1 PLAN PURPOSE/OBJECTIVES <br /> The purpose of this Facility Response Plan ("FRP or Plan") is to assist the Stockton <br /> Terminal ("Facility") personnel prepare for and respond quickly and safely to an incident at <br /> the Facility. The Plan provides techniques and guidelines for achieving an efficient, <br /> coordinated and effective response to an incident which may occur at the Facility. <br /> The specific objectives of the Plan are to: <br /> • Establish response team(s) as described in Section 4.0, assign individuals to fill the <br /> positions on the team(s) and define the roles and responsibilities of team members. <br /> • Define notification, activation, and mobilization procedures to be followed when an <br /> incident occurs. <br /> • Define organizational lines of responsibility to be adhered to during a response <br /> operation. <br /> . Ensure compliance with certain federal, state, and local regulatory requirements. A <br /> summary of the applicable regulations addressed by this plan is provided in Section <br /> 1.5. <br /> • Ensure consistency with the National Contingency Plan and Area Contingency Plan(s) <br /> for the area of operation. <br /> 1.2 FORMAT AND SCOPE OF PLAN <br /> This Plan has been developed under the general guidance published in the Federal Register <br /> by the Environmental Protection Agency (EPA) entitled "The National Response Team's <br /> (NRT) Integrated Contingency Plan" (ICP) (61 FR 28642). The NRT guidance was developed <br /> in conjunction with the EPA, Department of Transportation (DOT) U.S. Coast Guard (USCG), <br /> Research and Special Programs Administration (RSPA), replaced by Pipeline and <br /> Hazardous Materials Safety Administration (PHMSA), Department of the Interior (DOI) <br /> Minerals Management Service (MMS), replaced by Bureau of Safety and Environmental <br /> Enforcement (BSEE), and the Department of Labor (DOL) Occupational Safety and Health <br /> Administration (OSHA). This guidance also provides for state and local contingency planning <br /> requirements to be incorporated into the Plan. <br /> This Plan contains prioritized procedures for Facility personnel to mitigate or prevent any <br /> discharge resulting from the operations of the Facility. A description of the operations <br /> conducted at the Facility is provided in Figure 1.1 with additional information provided in the <br /> "Hazard Evaluation" located in Appendix C and Response Actions listed in Section 3.0 <br /> Shell Supply and Distribution 1-2 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />