Laserfiche WebLink
B.Worst Case Discharge Analysis and Scenarios Version:27.10.4 <br /> Notes <br /> . Equipment and personnel resources are detailed in Section 4.0 and Appendix A. <br /> . Telephone notification and contact references are provided in Figures 2.1, 2.2 and 2.5. <br /> • Spill response personnel, including Facility members, are continually trained to respond to <br /> worst case discharges through regularly scheduled PREP exercises (i.e. TTX, QI <br /> notification, equipment deployment), discharge prevention/safety meetings, FRP reviews, <br /> and HAZWOPER training. A minimum of one tabletop exercise (TTX) in a triennial cycle will <br /> involve a Worst Case Discharge scenario. <br /> Shell Supply and Distribution B-18 Stockton Terminal FRP <br /> ©2019 Witt 0' Brien's Revision Date:October, 2019 <br />