My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2200 - Hazardous Waste Program
>
PR0514502
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 6:00:52 PM
Creation date
6/26/2020 12:43:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0514502
PE
2228
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
775
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.Training and Drills Version :27.10.4 <br /> Annual Equipment Deployment Exercise(facilities with OSRO-owned equipment) <br /> . Review: The Facility should verify that the OSRO(s) has completed the equipment <br /> deployment exercise requirements and has maintained the necessary documentation. <br /> The OSRO may deploy equipment at any location, so long as it occurs within an <br /> operating environment similar to the Facility's. <br /> . Scope: USCG certified OSRO's must ensure and document that an exercise or <br /> response has been conducted in each response area in which they are certified. Non- <br /> certified OSRO's must deploy and operate response equipment identified in this <br /> response plan. The equipment to be deployed must include the following, at a <br /> minimum: <br /> 1,000 feet of each type of boom listed in the plan. <br /> One of each type of skimming system listed in the plan. <br /> . Objective: OSRO must demonstrate the ability of the personnel (OSRO) to deploy <br /> and operate response equipment (OSRO). Ensure that the response equipment <br /> (OSRO) is in proper working order. <br /> Shell Supply and Distribution E-8 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.