Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> Ilig 1;4F;Frg&11-1411KI I <br /> §265.50 -56 BRIEF DESCRIPTION LOCATION IN <br /> PLAN <br /> §265.56 - Eme Vd) Am <br /> (d)(2)(v) The extent of injuries, if any; and Fig. 2.3 - <br /> Notification Data <br /> Sheet <br /> (d)(2)(vi) The possible hazards to human health, or the environment, Fig. 2.3 - <br /> outside the facility. Notification Data <br /> Sheet <br /> (e) During an emergency, the emergency coordinator must take all § 3.3 - Incident <br /> reasonable measures necessary to ensure that fires, Specific <br /> explosions, and releases do not occur, recur, or spread to other Response <br /> hazardous waste at the facility. These measures must include, Actions <br /> where applicable, stopping processes and operations, collecting <br /> and containing released waste, and removing or isolating <br /> containers. <br /> (f) If the facility stops operations in response to a fire, explosion or § 3.3 - Incident <br /> release, the emergency coordinator must monitor for leaks, Specific <br /> pressure buildup, gas generation, or ruptures in valves, pipes or Response <br /> other equipment, wherever this is appropriate. Actions <br /> (g) Immediately after an emergency, the emergency coordinator App. F - Disposal <br /> must provide for treating, storing, or disposing of recovered Plan <br /> waste, contaminated soil or surface water, or any other material <br /> that results from a release, fire, or explosion at the facility. <br /> (Comment:Unless the owner or operator can demonstrate, in accordance <br /> with§261.3(c)or(d)of this chapter, that the recovered material is not a <br /> hazardous waste, the owner or operator becomes a generator of hazardous <br /> waste and must manage it in accordance with all applicable requirements of <br /> Parts 262, 263, and 265 of this chapter.] <br /> (h) The emergency coordinator must ensure that, in the affected ----- <br /> areas(s) of the facility: <br /> (h)(1) No waste that may be incompatible with the released material is App. F - Disposal <br /> treated, stored, or disposed of until cleanup procedures are Plan <br /> completed; and <br /> (h)(2) All emergency equipment listed in the contingency plan is § 5.1 - Incident <br /> cleaned and fit for its intended use before operations are Action Plan , § 5.3 <br /> resumed. - Site Safety Plan, <br /> § 3.4 - Safety <br /> Shell Supply and Distribution Cross Ref-10 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />