Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> kyj • • • • • <br /> BRIEF DESCRIPTION LOCATION IN <br /> E M b--A' ... <br /> 817.02(d)(5)(C) List of response personnel and qualifications Figure 2.2, §4.0 <br /> 817.02(d)(5)(D) Any equipment and personnel identified in the plan must be App. A <br /> available for response. <br /> 817.02(d)(5)(E) Group 5 Oils N/A <br /> 817.02(d)(5)(F) The use of non-mechanical methods for response operations which N/A <br /> may include dispersants, in-situ burning, coagulants, <br /> bioremediants, or other chemical agents <br /> 817.02(d)(5)(G) The plan shall describe methods for tracking the movement of the App. G <br /> discharged oil; and <br /> 817.02(d)(5)(H) The plan shall list the location of the weather stations to be used for App. G <br /> observations of winds, currents and other data at the time of a spill <br /> that may assist in making real-time projections of spill movement. <br /> 817.02(e) Shoreline Protection: Each plan must provide for shoreline App. G <br /> protection of all potential spills from the marine facility. <br /> 817.02(e)(1) Shoreline Response Planning Volumes App. G <br /> 817.02(e)(1)(A) Multiply the reasonable worst case spill for the marine facility, as App. G <br /> calculated in Subsection 817.02(d)(1), by the appropriate <br /> persistence factor from the chart below for the most persistent type <br /> of oil that may be spilled: <br /> 817.02(e)(1)(B) Emulsification Factors App. G <br /> 817.02(e)(1)(C) Total Shoreline Equipment Required App. B <br /> 817.02(e)(2) Shoreline Protection Equipment and Services App. A <br /> 817.02(e)(2)(A) Equipment identified for a specific area must be appropriate for use App. A <br /> in that area given the limitations of the bathymetry, geomorphology, <br /> shoreline types and other local environmental conditions <br /> 817.02(e)(2)(B) Each plan shall have under contract or other approved means App. A <br /> sufficient trained personnel to respond to all oil spills up to the <br /> calculated Response Planning Volume, which are to remain on <br /> scene until demobilized by the State Incident Command or the <br /> Unified Command. For planning purposes, this shall include <br /> procedures to obtain sufficient personnel to maintain a response <br /> effort of at least 14 days. <br /> 817.02(e)(2)(C) Any equipment and personnel identified to meet the planning App. A <br /> standard requirements must be available for response. <br /> 817.02(e)(4) Shoreline Clean-Up ----- <br /> 817.02(e)(4)(A) Utilizing the equipment that must be under contract, each plan shall § 6.0, App. A <br /> describe the methods that will be used to contain spilled oil and <br /> remove it from the environment. The equipment identified for a <br /> specific area must be appropriate for use in that area given the <br /> limitations of the bathymetry, geomorphology, shoreline types and <br /> other local environmental conditions. <br /> Shell Supply and Distribution Cross Ref-19 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />