Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> IE2 <br /> LOLok <br /> H • • <br /> BRIEF DESCRIPTION LOCATION IN <br /> 817.02(e)(4)(B) Protection, response, and clean-up strategies § 6.0, App. G <br /> 817.02(e)(4)(C) Utilize all the strategies appropriate to the potential impact sites § 6.0 <br /> 817.02(e)(4)(D) Contracted, or other approved means sufficient trained personnel to App. A <br /> respond to all oil spills up to the Response Planning Volume <br /> 817.02(f) Response Procedures ----- <br /> 817.02(f)(1) Describe the organization of the marine facility's spill response §4.0, § 5.0 <br /> system and management team <br /> 817.02(f)(1)(A) Chain of command §4.0, § 5.0 <br /> 817.02(f)(1)(B) Public Information Officer §4.0, § 5.0 <br /> 817.02(f)(1)(C) Safety program §4.0, § 5.0 <br /> 817.02(f)(2) Each plan shall identify potential sites needed for spill response ----- <br /> operations including location(s)for: <br /> 817.02(f)(2)(A) Establishment of central command post App. G <br /> 817.02(f)(2)(B) Establishment of communications post App. G <br /> 817.02(f)(2)(C) Establishment of equipment and personnel staging areas App. G <br /> 817.02(f)(3) Depiction of major stages of response §4.0 <br /> 817.02(f)(4) describe how the plan holder will provide emergency services before § 3.0, §4.0 <br /> the arrival of local, state or federal authorities on the scene <br /> 817.02(f)(4)(A) Fire, explosion, and rescue procedures § 3.0 <br /> 817.02(f)(4)(B) Medical treatment/first aid procedures § 3.0 <br /> 817.02(f)(4)(C) Ground, marine, and air traffic control § 3.0 <br /> 817.02(f)(4)(D) Management of access and decontamination § 3.0, §4.0, App. E <br /> 817.02(f)(4)(E) PPE for responders § 3.0 <br /> 817.02(f)(5) Describe equipment and procedures to be used by marine facility § 3.0, App A <br /> personnel <br /> 817.02(f)(5)(A) Spill minimization/mitigation procedures § 3.0 <br /> 817.02(f)(5)(B) For spill mitigation procedures the plan shall include prioritized § 3.0 <br /> procedures for marine facility personnel including specific <br /> procedures to shut down affected operations. <br /> 817.02(f)(6) Detail the lines of communications between the responsible party, § 2.0, §4.0, § 5.0 <br /> the Qualified Individual and the on-scene coordinators, response <br /> teams, and local, state, and federal emergency and disaster <br /> responders. <br /> 817.02(f)(6)(A) Communication procedures § 2.0, §4.0, § 5.0 <br /> 817.02(f)(6)(B) Communication function/channels/procedures App. A <br /> 817.02(f)(6)(C) Maximum broadcast ranges App. A <br /> 817.02(f)(6)(D) Redundant and back-up systems App. A <br /> 817.02(f)(7) Procedures to manage access to the spill response site, the §4.0, § 5.0, App. E <br /> designation of exclusion, decontamination and safe zones, and the <br /> decontamination of equipment and personnel during and after oil <br /> spill response operations. <br /> Shell Supply and Distribution Cross Ref-20 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />