Laserfiche WebLink
Regulatory Cross Reference Version :27.10.4 <br /> CALIFORNIA •DOF • <br /> DIVISIONTITLE 14 :D • SECTION <br /> BRIEF DESCRIPTION LOCATION IN <br /> PLAN <br /> 817.04(r)(1)(C) Use and operation of oil spill response and clean-up equipment, if App. E <br /> appropriate. <br /> 817.04(r)(2) Training records shall be maintained for three (3)years. All such App. E <br /> documentation must be promptly made available to the <br /> Administrator upon request. <br /> 817.04(u) Drills and Exercises App. E <br /> Each plan shall describe the Inland Facility's drill and exercise <br /> program that meets the drills and exercises requirements of <br /> Section 820.02, to ensure that the elements of the plan will function <br /> during a spill. <br /> 820.02 Drills and Exercises ----- <br /> 820.02(a) Applicability: The Drills and Exercises requirements in this section ----- <br /> apply to the new Plan Holders under OSPR jurisdiction due to the <br /> passage of SB 861 (Chapter 35, Committee on Budget and Fiscal <br /> Review, Statues of 2014). <br /> 820.02(b) Drills and Exercises shall be designed to exercise either portions of ----- <br /> the contingency plan or the entire plan, and accomplish the <br /> applicable drill objectives required by this section. <br /> 820.02(b)(1) For Tier I Facilities: ----- <br /> 820.02(b)(1)(A) 1. A Tabletop Exercise (as defined in Section 815.05), announced App. E <br /> or unannounced, of SMT(s). <br /> 2. Any number of objectives as described in Subsection (f) may be <br /> tested. <br /> 3. Over a three year period, each objective as described in <br /> Subsection (f) must be tested and successfully met. <br /> 820.02(b)(1)(B) Notification procedures listed in the plan shall be conducted App. E <br /> quarterly with actual calls made to the OSRO, QI, and the SMT. <br /> 820.02(b)(1)(C) For Tier I Facilities that own spill response equipment, semiannual App. E <br /> Equipment Deployment Drills shall be conducted to test the <br /> deployment of Plan Holder-owned equipment, which shall include <br /> immediate containment strategies, as outlined in the contingency <br /> plan. <br /> 820.02(b)(1)(D) Shoreline protection strategies shall be exercised as described in App. E <br /> Subsection (c). <br /> 820.02(b)(2) For Tier II Facilities: N/A <br /> 820.02(b)(3) For Tier III Facilities: N/A <br /> 820.02(b)(2) For Tier II Facilities: N/A <br /> 820.02(b)(3) For Tier III Facilities: N/A <br /> 820.02(c) Shoreline Protection Strategies for Sensitive Sites App. E <br /> 820.02(d) The Administrator, in addition to the requirements contained in this App. E <br /> Section, may call a drill or exercise, or conduct an inspection, to <br /> validate all or part of a contingency plan. <br /> Shell Supply and Distribution Cross Ref-35 Stockton Terminal FRP <br /> ©2019 Witt O' Brien's Revision Date:October, 2019 <br />