Laserfiche WebLink
s <br />CA ARNG Field Quality Assurance Project Plan <br />• Depth or location of any loss of drill water circulation, loss of tools or equipment; <br />i <br />• Location of any fractures, joints, faults, cavities, or weathered zone (if cored); <br />• Depth of any grouting or sealing; <br />• Nominal hole diameters; <br />• Amount of cement used for grouting or sealing; <br />• Depth and type of well casing; <br />• Description (to jnclude length, location, diameter, slot sizes, material, and manufacturer) of well <br />screen(s); <br />• Any sealing -off of waterbearing strata; <br />• Static water level upon completion of the well and after development; <br />• Drilling date or dates; and <br />• Construction details of monitoring well. <br />9.1.9.8 Each geologic field log will be approved by the California Registered Geologist supervising the <br />project. <br />-Soil and Sediment Data Sheets <br />9.1.9.9 Soil and sediment data will be recorded on sample data sheets. An example of the sample data <br />sheet to be used is shown in Figure 9-5 at the end of the section. Data to be recorded includes the <br />following: <br />• Sample depth; <br />• Sample ID number; <br />• Time; <br />• PID reading; <br />• Lab where sample is to be shipped; <br />• Boring ID; <br />• Date; and <br />• Sampler's initials. <br />field QAPP.DOC 9-14 May 2000 <br />