My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 9:39:55 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AVIATION SUPPORT FACILITY / PFAS SITE INSPECTION
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004 AND 17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CA ARNG Field Quality Assurance Project Plan <br />Groundwater Sampling Data Sheet <br />i <br />9.1.9.12 The groundwater sampling data sheet for monitoring wells will be used during groundwater <br />sampling and well development activities (Figure 9-8 at the end of the section). Specific well information <br />will be recorded at the top of each form. During groundwater sampling, the following information will be <br />recorded: <br />• Installation name; <br />• Correct designation for well sampled, including alphanumeric code assigned to the well and its zone <br />or horizontal designation (e.g., 11L002MW); <br />• Historical data; <br />• Static water level (before sampling); <br />• Depth to water after sampling; <br />• Length of standing water column; <br />• Well and purge volumes; <br />• Sampling method; <br />• Time; <br />• Field parameters measured (pH, SC,temperature, and turbidity); <br />• Initials of field technician(s); <br />• Weather conditions; <br />• Equipment calibration information; and <br />• Total number of samples collected and a description of the analyses. <br />Daily Field Progress Reports <br />9.1.9.13 Daily field progress reports may be submitted to the Delivery Order Manager during field <br />activities by facsimile or e-mail at the end of each field day. The report will include a discussion of the <br />following topics at a minimum_ <br />• Date; <br />• Weather, including temperature, approximate wind speed, and wind direction; <br />• Personnel performing site activities; <br />• Any visitors to the site; <br />i <br />field QAPP.DOC 9-16 May 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.