Laserfiche WebLink
evaluating weather and chemical hazard information and making <br />recommendations to the Project Manager about any modifications to work plans <br />or personal protection levels in order to maintain personal safety; <br />coordinating upgrading or downgrading of PPE with the Site Safety Officer, as <br />necessary, due to changes in exposure levels, monitoring results, weather, or other <br />site conditions; <br />approving all field personnel working on Site, taking into consideration their level <br />of safety training, their physical capacity, and their eligibility to wear the <br />protective equipment necessary for their assigned tasks (i.e., respirator fit testing <br />results and Medical Monitoring Program requirements); and <br />overseeing the air -monitoring procedures as they are carried out by site personnel <br />for compliance with all company health and safety policies. <br />2.3 SITE SAFETY OFFICER: Larry Kleinecke <br />The Site Safety Officer shall be responsible for the implementation of the site safety plan and <br />EPP on Site. Specific duties will include: <br />- monitoring the compliance of field personnel for the routing and proper use of the <br />PPE that has been designated for each task; <br />routinely inspecting PPE and clothing to ensure that they are in good condition <br />and are being stored and maintained properly; <br />stopping work on the Site or changing work assignments or procedures if any <br />operation threatens the health and safety of workers or the public; <br />monitoring personnel who enter and exit the Site and all controlled access points; <br />reporting any signs of fatigue, work-related stress, or chemical exposures to the <br />Project Manager and the Regional Health and Safety Officer within 24 hours, as <br />directed in the Corporate Health and Safety Manual and the UPP; <br />dismissing field personnel from the site if their actions or negligence endangers <br />themselves, co-workers, or the public and reporting the same to the Project <br />Manager and the Regional Health and Safety Officer within 24 hours, as directed <br />in the Corporate Health and Safety Manual and EPP; <br />3025-03/114700.4766.023/RM3'03 4 <br />