My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
PR0009229
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 9:39:55 AM
Creation date
6/26/2020 5:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009229
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0004047
FACILITY_NAME
STOCKTON ARMY AVIATION SUPPORT FACILITY / PFAS SITE INSPECTION
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726004 AND 17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reporting accidents or violations of the site safety plan to the Project Manager <br />and/or Regional Health and Safety Manager within 24 hours, as directed by the <br />Corporate Health and Safety Manual and the UPP; <br />knowing emergency procedures, evacuation routes, and the telephone numbers of <br />the ambulance, local hospital, poison control center, fire and police departments, <br />per the site safety plan; <br />ensuring that all project -related personnel have signed the personnel agreement <br />and acknowledgments form contained in this site safety plan; <br />coordinating, upgrading, and downgrading of PPE with the Regional Health and <br />Safety Officer, as necessary, due to changes in exposure levels, monitoring results, <br />weather, and other Site conditions; and <br />performing air monitoring with approved instruments in accordance with <br />requirements stated in this site safety plan. <br />2.4 FIELD TEAM LEADER: Jeni VanDusen <br />In the event that the Project Manager and the Site Safety Officer are not on the Site, the Field <br />Team Leader will assume responsibility for enforcing the safety procedures described in this site <br />safety plan, the Corporate Health and Safety Manual, and the IIPP. <br />2.5 FIELD PERSONNEL <br />All field personnel shall be responsible for acting in compliance with safety procedures outlined <br />in this site safety plan, the Corporate Health and Safety Manual, and the IIPP. Any hazardous <br />work situations or procedures should be reported to the Site Safety officer so that corrective steps <br />can be taken. The Regional Health and Safety Officer and/or Site Safety Officer has the authority <br />to halt any operation that does not follow the provisions of this site safety plan. <br />3 02 8-03/114700.47 66.023JUL2 3'03 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.