Laserfiche WebLink
2. Central Accumulation Area <br /> 2.1 Set-Up <br /> FIR <br /> � aarh � <br /> -erais6 otowg MeeWswea.4 to <br /> arok re d* bw WinfftwMa ste <br /> (1106qurmsAtoo, <br /> Notes: <br /> All HD Supply locations that have the potential to generate Hazardous Waste are required to have a Hazardous Waste <br /> Central Accumulation Area like the one pictured here. <br /> Chances are,this area has already been set up at your facility. If not,contact the Enterprise EHS Team to assist you,as <br /> there are several key criteria that must be met for choosing a location. <br /> If you have a Central Accumulation Area that needs to be moved,also reach out to the Enterprise EHS Team for assistance. <br /> Published by Articulate® Storyline www.articulate.com <br />