Laserfiche WebLink
I <br /> 06 November 2006 <br /> AGE-NC Project No 04-1168 <br /> Page 5 of 5 <br /> Additional on-site and off-site investigation maybe necessary to define the vertical and lateral extent <br />' of petroleum hydrocarbon-impacted ground water <br />' 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> points(ground water samples)and subsurface conditions may vary away from these data points No <br /> other warranty, expressed or implied, is made as to the professional interpretations, opinions, and <br /> recommendations contained in this report <br /> I <br /> I <br /> Advanced GeuEnvoronwentai,Inc <br /> I <br />