My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2249
>
2900 - Site Mitigation Program
>
PR0523411
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 2:34:24 PM
Creation date
6/30/2020 2:04:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523411
PE
2951
FACILITY_ID
FA0015821
FACILITY_NAME
JOHN RAY COMPANY
STREET_NUMBER
2249
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2249 E WATERLOO RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iL <br /> I; • S I, rt <br /> 6. Re-excavationlret mple: Due to the depth of ground wa er expected at <br /> approximately 45-60 feet and the small size of the tank', Jim Thorpe Oil and <br /> registered geologist Ground Zero feel the best method Cof clean up will be re- <br /> excavation and extend west to a point approximately 24 feet distance and a point <br /> south approximately 5 feet from the existing excavation to a northerly point and <br /> approximately 20 feet distance. The excavation shall be approximately 20 feet in <br /> depth. The close proximity of a power pole (see;attached plot plan) precludes- <br /> excavation to the east any long distance. Actual excavation limits will be <br /> determined in the field based on conditions encountered. <br /> The resulting excavation will be approximately 20 feet by 20 feet by 20 feet. <br /> Total amount of spoil removed will be approximately 300 cubic yards. <br /> �! <br /> All spoil will be placed on a 6-mil plastic and covered with same on site:- Soil <br /> disposition decisions can be made after amounts'land contamination levels are <br /> ascertained. Samples will be taken at the middlei'of therlength of each sidewall <br /> approximately 2 feet up from the bottom and 5 feet above that(i.e. 7 feet from <br /> the bottom) and at least one floor sample below the former tank location. Four <br /> (4) samples will be taken from the spoils pile for characterization. Soil samples <br /> will be analyzed for TPH-D,-BTEX,-totai lead, oxys (EPA 8260).. There are no <br /> water wells in the area. !` <br /> I <br /> The entire project will be under the direction of Ground Zero registered <br /> geologists. i <br /> All reports, conclusions, and recommendations will be made by Ground Zero <br /> showing existing excavations, proposed excavation, sample locations and plot <br /> h plan are attached. t <br /> 7. Health and safety plan attached. <br /> 8. Timing: Sampling could be scheduled within one week following your review-of <br /> this work plan. The sample analyses should be ready or your review within three <br />€ weeks after they have been taken. . <br /> Please contact me with any concerns or questions. <br /> Si*aci <br /> ere' <br /> Mart horpe �/ <br /> it <br /> Pre ident <br /> z <br /> E <br /> J <br /> f j1 <br /> f <br /> s <br /> �f I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.