Mr. Jim Crandall -2- 25 September 2013 <br /> Constellation Brands U.S. Operations, Inc. <br /> Please submit the Monitoring Well Installation Report at least 60 days prior to any discharge <br /> to LAAs P or Q, as required by Provision G.1.c of the WDRs. As required in Provision G.1.b <br /> of the WDRs, a Land Application Area Expansion Completion Report certifying completion of <br /> improvements to LAA blocks P and Q must be submitted at least 60 days prior to any <br /> planned flow increase above the interim flow limits of the WDRs. <br /> If you have any questions or need further clarification, please contact me at (916) 464-4616 or <br /> sarmstrono(a)waterboards ca ciov. <br /> SCOTT ARMSTRO G, P.G., C.HG. <br /> Engineering Geologist <br /> Waste Discharge to Land Permitting Unit <br /> cc: Rodney Estrada, San Joaquin County Environmental Health Department, Stockton <br /> Alicia Stamps, Kennedy/Jenks Consultants, San Francisco <br />