Laserfiche WebLink
0 Spore Test Checklist <br />❑ Verified 3M Attest Auto Reader is plugged in for at least 30 minutes prior to start of test <br />❑ Obtain biological indicators <br />❑ Don PPE <br />❑ Verified test pack and control tubes are from the same manufacturer <br />❑ Verified all biological indicator tubes are not expired <br />❑ Test pack loaded in the center of the medical waste load <br />❑ Place the "Test in Progress, Do Not Operate" sign on the chamber <br />❑ Ran sterilization cycle, verifed sterilization cycle at 250de revs F for 30 minutes <br />❑ Load was cooled and test pack was removed wearing PPE <br />❑ The medical waste was left in the chamber <br />❑ The incubation/readout procedure was followed: <br />Don PPE <br />Open test pack and remove indicator tube <br />Close the biological cap by pressing down <br />Crush the glass tube in the crushing well <br />vial <br />Place the tube into the incubator well <br />Cover and close, wait for results (at least 3 hours) <br />❑ Results read <br />Negative results: Control tube will be red, sterilized tube will be green <br />Positive results: Control tube will be red, sterilized tube will be red <br />Positive results: Control tube will be green, sterilized tube will be red <br />Positive results: Control tube will be green, sterilized tube will be green <br />❑ Test is negative; documented all information in the Record Log Book, including: <br />Date <br />Load number <br />Sterilizer number <br />Load contents <br />Tube Lot number/expiration date <br />Time and initials <br />Chemical indicator <br />Incubator well numbers, time in/time out, initials <br />Check "BI" box <br />positive or negative under Visual <br />❑ Test is negative; Notified EVS can use the Sanipak and removed sign <br />❑ Test is positive; test will be repeated one time <br />❑ Test is positive; notify EH&S Manager, Facility Services Director, Chief Engineer <br />and EVS Manager <br />Performed by: Title: Date: _ <br />Verified by: Title: Date: _ <br />Sani-Pak Spore Testing Checklist Attachment A Policy Number: <br />February 2009 <br />