Laserfiche WebLink
County of Riverside <br /> <br /> 7 <br />(b) The design shall consider one or more proposed uses of the site toward which the <br />operator will direct its effect. <br /> <br />The installation of an 8.5 megawatt solar generating facility is the intended use of the site. The <br />site improvements have been designed to avoid penetrations to the cover and to minimize any <br />potential future damage associated with settlement. <br /> <br />(c) All post closure land uses, other than open space, on sites implementing closure or on <br />closed sites shall be submitted to the LEA, CalRecycle, RWQCB, local air district and <br />land use agencies. <br /> <br />This PCLUP has been prepared to meet the requirements of Title 27, Section 21190 and will be <br />submitted to the agencies having jurisdiction at the closed West Riverside Landfill. <br /> <br />(d) Construction on the site shall maintain the integrity of the final cover, drainage and <br />erosion control systems, and gas monitoring and control systems. <br /> <br />Construction of the proposed solar arrays will have a minimal effect on the existing cover <br />barriers as previously described. No penetrations of the cover are planned. <br /> <br />(e) Construction of structural improvements on top of landfilled areas during the post <br />closure period shall meet the following conditions: <br />(1) , (2), and (3) Automatic methane gas sensors, designed to trigger an audible alarm <br />when methane concentrations are detected, shall be installed in all buildings. <br /> <br />There are no buildings or basements associated with the solar array installations, therefore <br />accumulation of methane in buildings is not anticipated. <br /> <br />(4) and (5) Utilities shall be constructed to mitigate the effects of differential settlement. <br />All utilities shall be designed with flexible connections and utility collars. <br /> <br />Utilities associated with the solar arrays will be installed above the closure barriers with flexible <br />connectors to accommodate differential settlement. <br />(5) And (7) Piling shall not be installed in or through any bottom liner unless approved <br />by the RWQCB. Penetration through the low permeability layer of final cover must <br />be sealed and repaired. <br /> <br />No penetration of the final Landfill cover are proposed.