My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
305
>
4400 - Solid Waste Program
>
PR0504176
>
COMPLIANCE INFO_1994-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:33:24 AM
Creation date
7/3/2020 10:34:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2017
RECORD_ID
PR0504176
PE
4430
FACILITY_ID
FA0006106
FACILITY_NAME
MANTECA CITY DUMP
STREET_NUMBER
305
Direction
N
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20015001
CURRENT_STATUS
01
SITE_LOCATION
305 N UNION RD
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504176_305 N UNION_1994-2017.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Riverside <br /> <br /> 8 <br />(8) Periodic methane gas monitoring shall be conducted inside all buildings and <br />underground utilities in accordance with Section 20933 of Article 6, of <br />Subchapter 4 of Title 27. <br />No buildings are planned as part of the solar array improvements. <br />(f) The LEA may require that an additional soil layer or building pad be placed on the final <br />cover prior to construction to protect the integrity and function of the various layers of <br />final cover. <br /> <br />The proposed solar array improvements will not be in direct contact with the final cover barrier <br />as shown on Drawing S2 in Appendix C, page 151 of this PDF. The arrays will be supported by <br />concrete skids, which will have a layer of aggregate between the cover and the bottom of the <br />skids. Care will be taken when moving solar panel skids. <br /> <br />(g) All onsite construction within 1,000 feet of the boundary of any disposal area shall be <br />designed and constructed in accordance with subparagraphs (1 through 7), or in <br />accordance with an equivalent design which will prevent gas migration into the building, <br />unless an exemption has been issued: <br /> <br />No buildings are planned as part of the solar array improvements. All existing structure are <br />monitored in accordance with the 1993 Closure and Postclosure Maintenance Plan and its <br />Amendments, (Earth Technology Corporation, 1993). <br />9 SUPPLEMENTAL MAINTENANCE PROGRAM <br />9.1 INTRODUCTION <br />A supplemental maintenance program will be implemented at the West Riverside Landfill after <br />installation of the solar arrays and will continue for the life of the solar array system, <br />approximately 20 years. This section describes the responsibilities, resources, and inspection <br />frequency for carrying out the maintenance plan. Specific inspection and maintenance activities <br />are detailed in subsequent Sections 9.2 through 9.5. <br /> <br />9.2 INSPECTION, MONITORING, AND MAINTENANCE <br />PROGRAM <br />9.2.1 Landfill Cover <br />27 CCR 21090 <br /> <br />A supplemental maintenance program will be conducted by SEI, and verified by the County, at <br />the Landfill to verify that the landfill final cover retains its integrity and effectiveness. The final
The URL can be used to link to this page
Your browser does not support the video tag.