Laserfiche WebLink
Document Number: 909 R 5003 <br />Procedure Rev: 13 Date: 6/10/13 <br />EMERGENCY RESPONSE PROCEDURES <br />Facility Information <br />Pilkington is headquartered in Toledo, Ohio and is a member of the Pilkington Group. The <br />Lathrop facility began operations in 1962 and currently manufactures automotive and <br />architectural glass. Manufacturing occurs over 3 shifts. Hourly employees are represented <br />by the American Steel Workers Union. <br />Other Information: <br />Dunn & Bradstreet No. - 00-497-1123 <br />SIC Code - 3231, 3211 <br />EPA No. - CAD 005415633 <br />Assessor Parcel No. 195-270-62 <br />Facility Location <br />The facility (Plant 10) is situated in the City of Lathrop, County of San Joaquin, and State of <br />California. The facility fronts Louise Avenue a major east/west route through the City of <br />Lathrop. Interstate 5 is a quarter mile west of the facility. An additional cross street is <br />Louise and Howland. <br />Facility Management Structure <br />Current facility management consists of seven area managers reporting directly to the <br />Plant Manager. Floor supervisors/shift managers report to the area managers and are <br />responsible for specific areas of the facility. Line employees report directly to the <br />supervisor in their area. <br />The facility utilizes, in the case of an emergency, the incident command system. Internally, <br />a unified team response will occur during an incident. The most senior member of <br />management staff, on-site at the time of the emergency, serves as the commander of the <br />team. Members of the team consist of the following staff: <br />H:\profile\My Documents\500 E. louise ave (CIA LOF)\9-25-13\909R5003 Emergency Response Procedures.doc <br />Page 3 of 67 <br />Paper Copies are Not Controlled unless stamped in RED "Controlled Document'. Controlled Version appears in QS9000 database. <br />Copies without a RED "Controlled Document' stamp will be OBSOLETE 24 hours from 10/7/2013 8:47 AM <br />