My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1968-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
COMPLIANCE INFO_1968-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:17:25 PM
Creation date
7/3/2020 10:34:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1968-2013
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504201_500 E LOUISE_FILE 1_1968-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document Number: 909 R 5003 <br />GROUP <br />Procedure Rev: 12 Date: 1/22/13 <br />EMERGENCY RESPONSE PROCEDURES <br />Incident Command System <br />In the case of certain emergencies, Pilkington will utilize the Incident Command <br />System. Pilkington will participate in any joint incident command system with <br />responding agencies, to facilitate a timely response to the emergency. <br />Roles of the Pilkington Incident Command Team are as follows: <br />• Plant Manager (incident commander) shall coordinate and make <br />available all necessary resources for an effective response and shall <br />maintain communications with corporate. <br />• Area Managers shall provide technical assistance and coordinate the <br />use of materials/equipment necessary for response as well as trained <br />personnel to assist in incident control. <br />• EHS / BATCH / FURNACE AND TECHNICAL Manager shall be <br />responsible for securing area, accountability of employees, and crowd <br />control. EHS / BATCH / FURNACE AND TECHNICAL Manager shall <br />determine if the incident poses a threat to the safety and health of <br />employees. In addition, shall assess the situation to determine if <br />hazardous materials are present and whether they pose a threat to <br />responders, the surrounding community or the environment. Will <br />provide technical information including Material Safety Data Sheets. <br />EHS / BATCH / FURNACE AND TECHNICAL Manager shall act as <br />incident commander. <br />• Human Resources Manager shall be responsible for communications <br />with media. <br />• If the emergency occurs during non -business hours, the incident <br />commander shall be the highest ranking manager/supervisor on-site. <br />Once appropriate personnel arrive on-site, the incident commander <br />may change. <br />H:\profile\My Documents\500 E. louise ave (CIA LOF)\9-25-13\909R5003 Emergency Response Procedures.doc <br />Page 15 of 67 <br />Paper Copies are Not Controlled unless stamped in RED "Controlled Document". Controlled Version appears in OS9000 database. <br />Copies without a RED "Controlled Document" stamp will be OBSOLETE 24 hours from 10/7/2013 8:47 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.