Laserfiche WebLink
j Section 2: <br /> SUMMARY <br /> This Summary contains a brief synopsis of the following section of this EIR: <br /> • The River Pointe project. (See the"Project Description" chapter for a complete dis- { <br /> i cussion of the project.) <br /> • The significant impacts that might result from the River Pointe project. (See the"Set- i <br /> ting,Impacts,Mitigation Measures& Monitoring Procedures"chapter for a complete + <br /> discussion of impacts and significant impacts of the project.) <br /> • The mitigation measures.recommended to eliminate or reduce the significant impacts <br /> from the project. (See the"Setting,Impacts,Mitigation Measures &Monitoring Pro- <br /> cedures" chapter for a complete discussion of mitigation measures proposed in this <br /> report.) <br /> • The monitoring procedures which are designed to ensure compliance with the mitiga- <br /> tion measures during project implementation (See the"Setting,Impacts,Mitigation <br /> Measures&Monitoring Procedures"chapter for a complete discussion of the monitor- . <br /> ing procedures proposed in this report.) <br /> • Alternatives discussed in the EIR. (See the"Alternatives" chapter for a complete dis- <br /> cussion of alternatives proposed in this report.) <br /> Readers should refer to the Summary only for a brief synopsis. Commentors are urged to <br /> make their comments on the basis of the full body of the text in each chapter. <br /> River Pointe Project <br /> r . <br /> Ford Construction Company has submitted an application to the City of Lodi for the <br /> River Pointe project. This application consists of a request for: <br /> • A General Plan Amendment to change the designation of the southern portion of the <br /> project site from HI(Heavy Industrial)to LDR(Low Density Residential). The north- <br /> em portion of the site would remain designated as IDR. <br /> • A rezoning for the project site from M-2(Heavy Industrial) and F-P(Floodplain)to P- <br /> D (Planned Development). <br /> • Approval of a Tentative Map to subdivide the 12.11 acre site into 45 single family lots. <br /> The lots would be serviced by a private street system.(River Pointe Circle and River , <br /> Pointe Court)with the project entry from Turner Road. <br /> j Significant impacts, Mitigation Measures & Monitoring Procedures <br /> Table 1 summarizes the significant impacts,mitigation measures and monitoring proce- <br /> dares discussed in this EIR. In Table 1,the left-hand column lists the significant impacts <br /> of the proposed project, the center column lists the mitigation measures to eliminate or i <br /> reduce those significant impacts and the right-hand column lists the monitoring proce- <br /> dures to ensure compliance during project implementation. <br /> 2 <br />