Laserfiche WebLink
Page 11 FE 382-063-0'0 <br /> The southern section of lot 1 , the central portion of the <br /> : site containing lot 2 , and the north section of lo.t 3 should be <br /> brought to a.n elevation of about 55 feet prior to receiving <br /> foundations . The northern portion of lot 1 is considered <br /> unsuitable f or receiving normal foundations without incurring ; <br /> excessive cost.- Detailed recommendations for the central and <br /> ` <br /> southern portion of the site contai-ring the southern portion of <br /> lot 1, lots 2 , 3, 4, A and B for foundati.ons , :site .preparation , <br /> and other items are included in sections hereinafter. <br /> The portion of the project site contained in the southern <br /> portion of lot 1 and. lots 2 , 3 , 4 , A and B is underlain by <br /> stratums of debris -and ,lenses of organic matter. Due to the. <br /> .,ariability, location, and depths where debris and organic matter <br /> was encountered, we recommend that the foundations for entire <br /> building sites on lots 2 , 3 , 4 , A and B be designed in a <br /> conservative manner. <br /> Spread Foundations : After the areas to receive foundations <br /> have been brought -to a.n elevation of approximately 55 feet, those <br /> lots , or portions of , identified as suitable for receiving <br /> foundations should be cleared of surface vegetation and debris. <br /> We recommend removing and replacing the near-surface material <br /> from below the building sites to a depth of approximately 6 to 8 <br /> f eet . The objective is to locate and ensure removal of the lens <br /> of organic materials encountered in test pits 1 and 2 . The <br /> `clic F ow-idkon E- into Inc. <br />