My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AWANI
>
0
>
4400 - Solid Waste Program
>
PR0504218
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 10:55:13 AM
Creation date
7/3/2020 10:35:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0504218
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0006126
FACILITY_NAME
CITY OF LODI LANDFILL
STREET_NUMBER
0
Direction
N
STREET_NAME
AWANI
STREET_TYPE
DR
City
LODI
Zip
95240
APN
04125038
CURRENT_STATUS
Active, billable
SITE_LOCATION
N AWANI DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0504218_0 N AWANI_2011.tif
Site Address
N AWANI DR LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 FE 382-0.63-00 <br /> Several foundation systems were considered for this site, <br /> raft foundations , shallow foundations with slab-on- grade , and <br /> deep foundations with pier and grade beam construction. The raft <br /> foundation system was not considered economically feasible due to <br /> the cost of necessary combating measures against the excessive •; <br /> potential. settlements that exist at this site. However, both the <br /> shallow foundation with slab--on-grade and deep foundation with <br /> pier and grade beam construction were considered feasible subject <br /> to the recommendations contained in this report. <br /> Un.anticipated.. so.il conditions are commonly encountered and <br /> cannot be fully determined by mere soil samples or test borings. <br /> Such 'unexpected conditions frequently require that additional <br /> Alk <br /> expenditures be made to attain a properly construction project. <br /> Therefore, some contingency fund is recommended to accomodate <br /> such potential extra costs. in light of the complex nature of the <br /> subsurface conditions at this site. <br /> : i <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> General : Based on results of our test borings, test pits, <br /> and laboratory tests conducted for this investigation , we <br /> conclude that the central and southern portion of the site which <br /> includes the southern portion of lot 1 , lots 2 , 3 , 4 , A and B <br /> could be developed for the proposed residential construction, <br /> if the recommendations. contained in this report are adhered to . <br /> 0. <br /> The Foundado;1 .n _►?C cs, h-ic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.