Laserfiche WebLink
«gay 1989. which required it to "submit a workplan for permanent mitigation of the <br /> hazards poscd by the presence of asbestos at the site" (2). The Responsible Party (R.P) <br /> was believed to have installed a permanent cap at the site in 1991, mitigating any hazard <br /> posed by the asbestos debris piles (19). <br /> URS Consultants, Inc. Page 2 <br />