Laserfiche WebLink
Ch. 1 —44- <br /> 43604. <br /> 44s <br /> After closure, and during the postclosure maintenance existing <br /> Period, a solid waste landfill owner or operator shallmaintain k The app <br /> evidence of financialability for postclosure maintenance at all times when tl <br /> equal to the estimatede <br /> cost of 15 years of postclosure maintenance, } e L: <br /> except that, 15 years before the end of the postclosure maintenance public h <br /> period specified in a postclosure maintenance plan approved by the filing pf <br /> board,an owner or operator may request approval of the board to <br /> 44005 <br /> Provide evidence of financial ability in a lesser amount. <br /> 43605. Nothing i this division affects the authority of the State date wl• <br /> Water Resources Control Board to impose closure and postclosure permit' <br /> maintenance requirements on solid waste landfills. <br /> 43 arrangements approved g by the. (a) Except for financial arran a p reem <br /> ortior. <br /> board pursuant to this article,no indemnification,hold harmless,or report <br /> similar agreement or conveyance is effective to transfer from the convey <br /> owner or operator of a solid waste landfill to any other person any <br /> obligations imp4400( <br /> osed on the owner or operator under this article. be sub: <br /> (b) Notwithstanding subdivision '(a), nothing in this section (b) <br /> prohibits any agreement between the owner and the operator be sub <br /> regarding their r ctive obligations for closure and postclosure c <br /> maintenance of a solid waste landfill, and nothingin this section ( ) <br /> prohibits a cause of action that an owner or operator has or would by the <br /> have against the other party by reason of that agreement, <br /> - aPplic <br /> CHAPTER 3. PERMIT AND INSPECTION PROCRA.M shall r, <br /> recovt <br /> Article 1. Solid Waste Facility Permits (coma <br /> Sectio <br /> author <br /> 1. Any person who proposes to become an operator of aso lid 440( <br /> waste facility, shall le with .the enforcement agency having - waste <br /> �Ft - jurisdiction over the facility, or the board if there is no designatedrovic <br /> and certified enforcement agency, an application for a solid waste perm , <br /> facilities permit at least 120 days in advance of the date on which it enfora <br /> is desired to commence operation. <br /> 440( <br /> . The operation of a solid waste facility by any person, 'th <br /> except as authorized pursuant to a solid waste.facilities permit issued by by 1h <br /> lic <br /> by the enforcement agency, is prohibited. 440 <br /> . When the operator of the disposal site is not the disposal <br /> site owner,,the'dis s issuer <br /> site operator's application for a solid waste issue <br /> facilities permit`shall contain any-information that the enforcement facilit <br /> therealmrequire regarding the disposal site owner's interest in � deter <br /> property utilized as the disposal site. shall <br /> . (a) No operator of a solid waste facility shall make a objec <br /> significant change in the design or operation of any solidwaste c <br /> facility`except in conformance with the terms and conditionin a deer <br /> solid waste facilities s t or revised permit issued by the . to i <br /> enforcement agency to t. <br /> at operator. 4t. <br /> (b) If the operator wishes to modify the operation of a solid waste finds <br /> facility, the operator shall file an application for revision of the the s <br /> 91 9Q <br />