My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
28902
>
4400 - Solid Waste Program
>
PR0526161
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 1:41:15 PM
Creation date
7/3/2020 10:39:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526161
PE
4430
FACILITY_ID
FA0017704
FACILITY_NAME
FRANK C ALEGRE TRUCKING INC
STREET_NUMBER
28902
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24138007
CURRENT_STATUS
02
SITE_LOCATION
28902 S KASSON RD
P_DISTRICT
005
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4430_PR0526161_28902 S KASSON_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This easement or restriction will prevent future distur- <br /> bance or removal of any vegetation . <br /> 3 . McMullin Reclamation District No. 2075 <br /> a . All existing borrow pits shall be filled to the same ele- <br /> vation as the adjacent ground by November 1, 1990 . <br /> b. The bank cut near River Mile 67 . 5 shall be filled and the <br /> waterward face shall be rock revetted to prevent the river <br /> from cutting across the bend and creating a new channel . <br /> c . The Reclamation Plan shall be modified to include the <br /> following elements : <br /> 1 . The borrow shall be excavated uniformly in strips <br /> starting at the upstream end and following the low <br /> water channel of the San Joaquin River . <br /> 2 . The lowest elevation of the borrow shall not be less <br /> than elevation 6 feet NGVD. A continuous grade from <br /> the water ' s edge to high ground shall be maintained as <br /> shown in the application. <br /> d. Bench marks with a surveyed elevation at NGV Datum shall <br /> be established and maintained at locations to be agreed <br /> upon by the Reclamation District to provide a method for <br /> verification of elevations and grade of the excavation. <br /> e . The excavation grade, as it progresses , shall be kept uni- <br /> form and shall not be lower than the finished grade <br /> approved in this Use Permit. <br /> f . Annual soundings shall be made of the San Joaquin River <br /> low water channel in the vicinity of the borrow operation. <br /> If silting of the low water channel occurs to the extent <br /> that the flow of water to nearby irrigation pumps is <br /> affected, the applicant shall remove the excess material <br /> from the channel if the necessary permits can be obtained. <br /> g. In addition to the annual inspection required by the <br /> Planning Division, the applicant shall have a registered <br /> engineer prepare a report that describes the progress of <br /> the mining operation and shows the grades of the final <br /> elevation. Said report shall be submitted to the McMullin <br /> Reclamation District No. 2075 . <br /> ORDINANCE REQUIREMENTS <br /> Unless otherwise specified, the approved use shall not be <br /> established nor building permits issued until the applicant has <br /> fulfilled all Ordinance Requirements . <br /> QX-89-3 (ALEGRE) RES #90-301 <br />
The URL can be used to link to this page
Your browser does not support the video tag.