Laserfiche WebLink
Austin Road Landfill WINTER <br />Operations September 30, 1983 to April 30, 1984 <br />Solid Waste Quantities <br />September 30, 1982 to April 30, 1983 195,544 cu. yds. <br />3% Annual Increase 5,866 cu. yds. <br />Projected Sept. 30, 1983 to <br />April 30, 1984 <br />201,410 cu. yds. <br />Average in truck density 400#/cu. yds. X <br />201,410 cu. yds. 80,564,000 lbs. received <br />80,564,000#/1,100#/cu. yds. compacted <br />landfill density <br />4.17 Average Depth <br />Area Required 350' X 450' <br />Cover Material <br />Winter area cover required (350' X 4501) <br />157,500 sq. ft. X 5' daily cover/ <br />27 cu. ft./cu. yd5.. <br />Working face 24' X 50' X.S' daily cover <br />126 working days/27'/cu. yds. <br />Total cover material required <br />Level winter landfill area with solid <br />waste and final 2' cover in May. <br />73,240 cu. yds. in landfill <br />172563 sq. yds. <br />2,916 cu. yds. <br />2,800 cu. yds. <br />6,000 cu. yds. <br />