Laserfiche WebLink
TABLE S.1: SUMMARY OF IMPACTS AND MITIGATION MEASURES (Continued) <br /> Environmental Impact Mitigation Measure Level of Significance After Mitigation <br /> C. Community Services and Utilities(Cont.) <br /> C.3. The proposed project would increase the landfill (a) Conduct weekly inspections of all facilities for Less than Significant <br /> area and extend the lifetime of the landfill safety(the Safety Checklist prepared by the <br /> operation,thus increasing the potential for fire National Solid Waste Management Association <br /> or medical emergencies on the site over the could be used for inspections). <br /> duration of the operation. (ADVERSE) <br /> (b) Conduct safety meetings with employees to <br /> disseminate safety information. <br /> (c) Provide personal protective gear for the safe <br /> handling of solid waste. <br /> CA. The proposed project would create and recover (a) The project sponsor shall provide independently Less than Significant <br /> leachate that would be treated at the Stockton corroborated test results to the City of Stockton <br /> City Municipal Utilities District wastewater Municipal Utility District to demonstrate the <br /> treatment plant,thus increasing treatment flow chemical composition of the leachate extracted <br /> at the wastewater treatment plant. from the Austin Road Landfill. A monitoring <br /> (SIGNIFICANT) plan shall be established by the project sponsor <br /> that would meet the requirements of the City's <br /> Wastewater Ordinance and the Municipal Utility <br /> District for continued testing of leachate. <br /> (b) If the leachate quality is not acceptable for <br /> disposal at the wastewater treatment plant the <br /> landfill should develop on-site leachate treatment <br /> processing that would result in processed <br /> leachate acceptable for disposal at the <br /> wastewater treatment plant or acceptable to <br /> regulatory agencies for on-site use. <br /> C.5 The proposed project would add incrementally None warranted. <br /> to demands for County public services and <br /> utilities in the area of the project. (ADVERSE) <br /> S.12 <br />