Laserfiche WebLink
Mae M MM MMMMM MM MM <br /> TABLE 5.1: SUMMARY OF IMPACTS AND MITIGATION MEASURES (Continued) <br /> Environmental Impact Mitigation Measure Level of Significance After Mitigation <br /> D. Transportation and Circulation <br /> D.1. The project(expansion of the Austin Road None warranted. <br /> Landfill to continue operations beyond 2007) <br /> would generate vehicle trips(employees and <br /> refuse trucks)on study area roadways and <br /> intersections. (ADVERSE) <br /> D.2. Project-generated truck traffic could result in None warranted. <br /> accelerated pavement deterioration on study <br /> area roadways. (ADVERSE) <br /> D.3. Project-generated truck traffic could result in None warranted. <br /> increased traffic safety hazards on study area <br /> roadways. (ADVERSE) <br /> E. Cultural Resources <br /> E.1. The Austin Road Landfill Expansion area,with (a) If prehistoric archaeological resources are Less than Significant <br /> Little Johns Creek running through it,is a discovered during excavation and construction of <br /> potential candidate for locating additional the proposed project,the project sponsor should <br /> and/or disturbing subsurface cultural deposits. suspend all work in the immediate vicinity of the <br /> (SIGNIFICANT) find pending site investigation by a qualified <br /> archaeologist or cultural resources consultant to <br /> assess the materials and determine their <br /> significance. <br /> (b) Allow only a qualified archaeologist or cultural <br /> resources consultant to collect any prehistoric <br /> cultural resources discovered on the site. <br /> S.13 <br />