Laserfiche WebLink
IISTATE OF CALIFORNIA r <br /> _ GEORGE DEUKMEJIAN,Governor <br /> CALIFORNIA INTEGRATED WASTE MANAGEMENT BOAR 'f <br /> 1020 NINTH STREET,SUITE 300 b� <br /> SACRAMENTO,CALIFORNIA 95814 <br /> AUG t ie <br /> 17 <br /> MUNITYT F ST, <br /> j �.rL X1:9E :trisma <br /> Mr. Michael Niblock <br /> City of Stockton rXUG 1 1990 <br /> Community Development Department <br /> Planning Division <br /> 6 East Lindsay Street <br /> Stockton, CA 95202 <br /> Subject: Notice of Preparation (NOP) of a Draft Environmental <br /> Impact Report (DEIR) for the expansion of Austin Reoad <br /> Sanitary Landfill, San Joaquin County. <br /> Dear Mr. Niblock: <br /> California Integrated Waste Management Board have reviewed the NOP <br /> for the expansion of Austin Road Landfill. The expansion area <br /> includes a 126 acre parcel which will be acquired from California <br /> Youth Authority, and a 95 acre parcel which will be acquired from <br /> Albert Brocchini Farms, Inc. <br /> CIWMB staff ask that the following information be addressed in the <br /> preparation of the DEIR: <br /> Sludge <br /> The project description includes a statement that the City was <br /> apparently given permission by the State and the Local <br /> Enforcement Agency to store sewage sludge at the landfill for <br /> future use as part of the foundation layer for the final cover <br /> on the landfill. Approximately 20, 000 cubic yards are stored <br /> at the landfill. Several activities are mentioned pertaining <br /> to the handling of sludge; co-disposal, composting, or use <br /> as a foundation or cover material. The DEIR should thoroughly <br /> address the proposed use(s) or disposal of the sludge. <br /> If sludge --is to be used as alternative daily cover, approval <br /> for such use is required from CIWMB. Contact Steve <br /> Austreheim-Smith of the Board's Environmental Engineering <br /> Section for more information pertaining to specific <br /> requirements for use of alternative cover. <br /> Realignment of Little John's Creek <br /> A branch of Little John's Creek disects the landfill site. <br /> A complete and thorough environmental analysis of the impacts <br /> and mitigations associated with re-alignment of the creek <br /> should be included as part of the project. <br />