My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1993_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:39:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1993_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Classification of wastes to be received (Group 2, 3, <br /> etc. ) <br /> 13. Ultimate end use of site <br /> 14. Maximum height of fill <br /> 15. Public and/or private use <br /> 16. Permits required by local and state agencies to implement <br /> the project - in sequence <br /> B. operations Description <br /> 1. Compliance with CWMB standards for handling and disposal <br /> (Title 14 CCR) <br /> 2. Method of disposal (area/trench/canyon) <br /> a) Construction of cells - height of cells, compaction <br /> 3. Depth of excavation <br /> 4. Maximum height of completed fill <br /> 5. Cover types - daily, intermediate <br /> a) Frequency of cover <br /> b) Thickness of cover <br /> C) Suitability of cover material <br /> d) Volume of cover material needed for the entire <br /> project <br /> e) Source and supply of cover - to end of site life <br /> 6. Anticipated waste compaction (lbs./cu. yd.) <br /> 7. Number & Job Titles of employees <br /> 8. Equipment - e. . compactor,Q p r, water truck, scraper, track <br /> dozer <br /> 9. Hours/days of operation - days/weeks of operation per <br /> year <br /> 10. Fire control provisions - on-site; nearest fire dept. <br /> 11. Vector control• provisions flies, -' rodents, birds, <br /> mosquitoes <br />
The URL can be used to link to this page
Your browser does not support the video tag.