Laserfiche WebLink
12. Classification of wastes to be received (Group 2, 3, <br /> etc. ) <br /> 13. Ultimate end use of site <br /> 14. Maximum height of fill <br /> 15. Public and/or private use <br /> 16. Permits required by local and state agencies to implement <br /> the project - in sequence <br /> B. operations Description <br /> 1. Compliance with CWMB standards for handling and disposal <br /> (Title 14 CCR) <br /> 2. Method of disposal (area/trench/canyon) <br /> a) Construction of cells - height of cells, compaction <br /> 3. Depth of excavation <br /> 4. Maximum height of completed fill <br /> 5. Cover types - daily, intermediate <br /> a) Frequency of cover <br /> b) Thickness of cover <br /> C) Suitability of cover material <br /> d) Volume of cover material needed for the entire <br /> project <br /> e) Source and supply of cover - to end of site life <br /> 6. Anticipated waste compaction (lbs./cu. yd.) <br /> 7. Number & Job Titles of employees <br /> 8. Equipment - e. . compactor,Q p r, water truck, scraper, track <br /> dozer <br /> 9. Hours/days of operation - days/weeks of operation per <br /> year <br /> 10. Fire control provisions - on-site; nearest fire dept. <br /> 11. Vector control• provisions flies, -' rodents, birds, <br /> mosquitoes <br />