My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1993_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:39:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1993_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Litter control provisions - fences, litter pick-up <br /> schedule <br /> 13. Traffic <br /> a) Access routes <br /> b) Present loading - project induced load <br /> C) On-site roads <br /> 14. Scales - number, <br /> weight limits, computerized recording <br /> 15. Odor control provisions <br /> 16. Dust control provisions <br /> 17. Record keeping <br /> 18. Erosion controls for wind, vehicular, run-on, run-off - <br /> e.g. berms, conduits, levees <br /> 19. Sedimentation controls - e.g. silt collection ponds <br /> 20. Landfill gas monitoring and quality assurance/quality <br /> control systems <br /> 21. Groundwater/Vadose zone monitoring sytems <br /> 22. Leachate controls <br /> a) Liner (if applicable) <br /> 1. Permeability of liner (cm/sec) <br /> 2. Sensitivity of line to acidic or caustic <br /> compounds <br /> 3. Quality Assurance/Quality Control <br /> installation <br /> b) Compaction of underlying soils <br /> 1. Permeability achieved after compaction (cm/sec) <br /> C) Collection system <br /> 1. ; Maximum gpm or gpd the system can handle: <br /> pumping, storage, disposal <br /> d) Recirculation <br /> e Im ermeable barriers arriers <br />
The URL can be used to link to this page
Your browser does not support the video tag.