Laserfiche WebLink
12. Litter control provisions - fences, litter pick-up <br /> schedule <br /> 13. Traffic <br /> a) Access routes <br /> b) Present loading - project induced load <br /> C) On-site roads <br /> 14. Scales - number, <br /> weight limits, computerized recording <br /> 15. Odor control provisions <br /> 16. Dust control provisions <br /> 17. Record keeping <br /> 18. Erosion controls for wind, vehicular, run-on, run-off - <br /> e.g. berms, conduits, levees <br /> 19. Sedimentation controls - e.g. silt collection ponds <br /> 20. Landfill gas monitoring and quality assurance/quality <br /> control systems <br /> 21. Groundwater/Vadose zone monitoring sytems <br /> 22. Leachate controls <br /> a) Liner (if applicable) <br /> 1. Permeability of liner (cm/sec) <br /> 2. Sensitivity of line to acidic or caustic <br /> compounds <br /> 3. Quality Assurance/Quality Control <br /> installation <br /> b) Compaction of underlying soils <br /> 1. Permeability achieved after compaction (cm/sec) <br /> C) Collection system <br /> 1. ; Maximum gpm or gpd the system can handle: <br /> pumping, storage, disposal <br /> d) Recirculation <br /> e Im ermeable barriers arriers <br />