II. Project Description <br /> The landfill operator is responsible for providing overall site security during normal working <br /> hours. <br /> LANDFILL CONSTRUCTION SCHEDULE <br /> The schedule in Table II.1 is based on the site life projections in Appendix A. <br /> LANDFILL OPERATIONS <br /> Waste Acceptance <br /> The following wastes are prohibited from the landfill. <br /> TABLE 11.1: CONSTRUCTION SCHEDULE <br /> Construction Year Closure Year <br /> PHASE I 1997 2001 <br /> PHASE II 2001 2007 <br /> PHASE III 2007 2013 <br /> PHASE IV 2013 2024 <br /> PHASE V 2024 2032 <br /> PHASE VI 2032 2045 <br /> SOURCE: R. W. Beck and Associates,Preliminary Draft of the Final Design Study Report for <br /> the.Austin Road Landfill Expansion, November 1992. <br /> Sewage Sludge <br /> Approximately 13,000 tons per year of sewage sludge is generated by the City Regional <br /> Wastewater Control Facility. The sludge is dried to a minimum 50 percent solids and stockpiled <br /> at the generating facility for future agricultural land application. The City's Source Reduction <br /> and Recycling Element(ERRE)proposes that a sewage sludge composting program be <br /> developed in the mid-term planning period at a site to be determined. Therefore,sewage sludge <br /> is not accepted at the Austin Road Landfill. <br /> II.18 <br />