Laserfiche WebLink
However, if testing of the new wells shows elevated levels of methane, the next step <br /> would be to expand the gas well extraction system. Discussions with the Oden Power <br /> Pacific, the company that owns the extraction system, have already been held and they <br /> are prepared to expand their system so that another extraction well is located between <br /> SGP-11A and 12A as shown on the attached Drawing #2. However, since this is the <br /> most costly option, it will not be pursued unless the new wells detect elevated levels of <br /> methane at the property boundary. <br /> If you have any questions, please contact me at (209) 937-8829. <br /> ROBERT MURDOCH <br /> SENIOR CIVIL ENGINEER <br /> cc: Jim Giottonini <br /> Stephen Chen <br /> Mike Miller <br /> 10- <br /> (� v <br /> t,•t� <br /> T:IWPWI NISOLIDWSTW USTI N RD\PLAN.GAS <br />