My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -9- <br /> FOR CITY OF STOCKTON <br /> AUSTIN ROAD LANDFILL FACILITY <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 9. Each landfill unit phase constructed after the effective date of this Order shall be <br /> designed and constructed in accordance with Chapter 15 and this Order and approved <br /> by Board staff prior to operation. Prior to the beginning of construction for each new <br /> construction phase, a Final Design Report shall be submitted to Board Staff for <br /> review and approval and shall include,but not be limited to, the engineered design <br /> plans for the WMU, the contract specifications, a construction quality assurance <br /> (CQA) plan to verify that construction specifications will be met, and a revised water <br /> quality monitoring plan. Approval of the final design report shall be obtained from <br /> Board staff prior to construction of the landfill liner or cap. A final construction <br /> report shall be submitted for approval by Board staff after each phase of construction <br /> and prior to the discharge of waste into the constructed phase. The final construction <br /> report shall include, but not be limited to, as-built plans for the WMU, a CQA report <br /> with a written summary of the CQA program and all test results, analyses, and copies <br /> of the inspector's original field notes, and a certification as described in the Standard <br /> Provisions and Reporting Requirements. <br /> Protection From Storm Events <br /> 10. Precipitation and drainage control systems shall be designed, constructed and <br /> maintained to accommodate the anticipated volume of precipitation and peak flows <br /> from surface runoff under 100-year, 24-hour precipitation conditions. <br /> 11. Waste management units shall be designed;construed and operated in compliance <br /> with precipitation and flood conditions contained in the Standard Provisions and <br /> Reporting Requirements referenced in Provision D.1,below. <br /> 12. Annually, prior to the anticipated rainy season; auy,necessary erosion control <br /> measures shakbe implemented, and'any necessaf�construction,maintenance, or <br /> repairs of precipitation and drainage control facilities shall be completed to prevent <br /> erosion,or,fleioding of the site and to pr v nt area* ' e from contacting or <br /> percolating through wastes. <br /> Landfill Specifications <br /> 14. Municipal solid waste shall be discharged to either(a)that portion of a module which <br /> received wastes(i.e., that active portion of the module which is within the boundaries <br /> of the Existing Footprint), or(b)to an area equipped with a containment system <br /> which meets the additional requirements for both liners and leachate collection <br /> systems specified below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.