Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS <br /> FOR CITY OF STOCKTON -10- <br /> AUSTIN ROAD LANDFILL FACILITY <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 15. All new containment systems shall: include a composite liner which consists of an <br /> upper synthetic flexible membrane component"(synthetic liner or SL) and a lower <br /> component of soil. The SL shall be at least 40-mils thick(or at least 60-mils thick if <br /> high density polyethylene) and shall be installed in direct and uniform contact with the <br /> underlying compacted soil component. The lower component shall be compacted soil <br /> that is at least two feet thick and that has an hydraulic conductivity of no more than 1 <br /> X 10'cm/sec(this specification is referred to as the Prescriptive Design). For landfill <br /> covers where clay is compacted over refuse, a hydraulic conductivity of 1 x 101 <br /> cm/sec may be substituted for the 1 x 10''cm/sec requirement. <br /> 17. New landfill units and lateral expansions shall not be located in wetlands unless the <br /> Discharger has successfully completed, and the Board has approved, all <br /> demonstrations required for such discharge under 40 CFR 258.12(a). <br /> 18. Landfill leachate shall be disposed of by a Board-approved method. <br /> Surface Impoundment Specifications <br /> 19. Design and constriction plans and specifications, including a construction quality <br /> assurance program, shall be submitted to Board staff for approval before construction <br /> of any surface impoundment. After surface impoundment construction, a <br /> construction quality assurance report shall be submitted to the Board and approved <br /> by Board staff'prior tb bppration of the surface impoundment. <br /> Landfill Closure Specifications <br /> 20. At closure, the unlined modules shall receive a final cover consisting, at a minimum, <br /> of a two-foot tick 1fo&ditidh layer which may contain waste materials, overlain by a <br /> one-foot thick clay,liner, and finally by a one-foot thick vegetative soil layer, or an <br /> engineered equivdht fi�iat cover;approved by the Board pursuant to Subsections <br /> 2510 ' ` � - - <br /> (b) and'(c) of'Lhapter 15. Lined landfill modules, or portions thereof, shall be <br /> covered with a barrier layer having a permeability at least as low as the liner. <br /> 21. Vegetation shall be planted and maintained over each closed landfill unit. Vegetation <br /> shall be selected to require a minimum of irrigation and maintenance and shall have a <br /> rooting depth not in excess of the vegetative layer thickness. <br /> 22. Closed landfill units shall be graded to at least a three percent grade and maintained <br /> to prevent ponding. <br />