Laserfiche WebLink
Austin Road Landfill E "on Project <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> with, and to the satisfaction of,CDFG <br /> and USFWS. Conditions attached to the <br /> CDFG Streambed Alteration Agreement <br /> shall be incorporated into the wetlands <br /> plan and implemented accordingly. <br /> (c)The following Pre-construction and <br /> construction measures should be <br /> implemented to salvage individuals and <br /> to minimize and avoid take. These <br /> measures are consistent with the recently <br /> released SJMSCP(Public Review Draft, <br /> September 23, 1999). <br /> -Construction shall occur during the <br /> active period for the snake,between May <br /> 1 and October 1. Between October 2nd <br /> and April 30th,the JPA with the <br /> concurrence of the Permitting Agencies' <br /> representatives on the TAC,shall <br /> determine if additional measures are <br /> necessary to minimize and avoid take. <br /> -Limit vegetation clearing within 200 <br /> feet of the banks of occupied giant garter <br /> snake aquatic habitat to the minimal area <br /> necessary. <br /> -Confine the movement of heavy <br /> equipment within 200 feet of the banks of <br /> occupied giant garter snake aquatic <br /> habitat to existing roadways to minimize <br /> habitat disturbance. <br /> -Prior to ground disturbance, all on-site <br /> construction personal shall be given <br /> instruction regarding the presence of <br /> SJMSCP-covered species and the <br /> importance of avoiding impacts to these <br /> species and their habitats. <br /> -If on-site wetlands,irrigation ditches, <br /> marshes,etc. are being relocated in the <br /> vicinity:the newly created aquatic habitat <br /> shall be created and filled with water <br /> prior to dewatering and destroying the <br /> pre-existing aquatic habitat. In addition, <br /> non-predatory fish species that exist in <br /> the Nuatic habitat and which are to be <br /> 17 <br />