Austin Road Landfill E& <br /> ion Project is <br /> 11 <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> relocated shall be seined and transported <br /> to the new aquatic habitat as the old site <br /> is dewatered. #j <br /> F.13. Any construction activities (a)Prior to initiating any work in the North LS �t <br /> conducted in or near the North Branch of Branch of the South Fork of Little Johns <br /> the South Fork of Little Johns Creek could Creek and adjacent habitats,pre- <br /> result in significant adverse impacts to construction surveys should be conducted <br /> western pond turtles. (POTENTIALLY within 48 hours prior to de-watering the <br /> SIGNIFICANT) creek channel.CDFG and USFWS should <br /> be consulted for guidance prior to any <br /> western pond turtle translocation work. <br /> Translocation should be conducted with <br /> the approvals of USFWS and CDFG. In <br /> addition,a detected nest would require a <br /> 300-foot buffer area for the nest and the ; <br /> associated wetlands while the nest is <br /> occupied. The nest site should be <br /> monitored by a qualified biologist until the <br /> hatchlings have left the nest. These <br /> buffers shall be indicated by temporary <br /> fencing if construction has begun or will <br /> begin before nesting periods have ended <br /> (the period from egg laying to emergence <br /> of hatchlings is normally April to <br /> November). Furthermore,any pre- <br /> construction and construction measures <br /> should be consistent the SJMSCP. <br /> F.14. Implementation of the project could a Pre-construction surveysfor greater LS <br /> result in significant adverse impacts to western mastiff bat should be conducted <br /> greater western mastiff bat. prior to removing any trees from the <br /> (POTENTIALLY SIGNIFICANT) project site. These pre-construction <br /> surveys may be required and funded by the <br /> SJMSCP JPA and should be conducted by <br /> a biologist with experience surveying for <br /> bats, and the surveys should not occur any <br /> more than 30 days prior to the proposed <br /> tree removal. If no special-status bats are <br /> identified during the pre-construction <br /> survey(s), then no impacts to these bats <br /> would be expected to occur from <br /> construction of the proposed project. If, <br /> however,greater western mastiff bat is <br /> identified in any of the trees proposed for <br /> removal,reproductive status should be <br /> determined. <br /> 18 - <br />