Laserfiche WebLink
Mr. Mike Miller -2- 2 November 1998 <br /> As noted in the facility's NPDES permit,the City needs to file its Notice.of Intent for coverage under <br /> the general storm water permit. The storm water pollution prevention plan must be implemented at the <br /> site. The City should be prepared to comply with the sampling and analysis requirements of the general <br /> permit at the start of the upcoming rainy season. <br /> If you have'any questions,please call me at(916) 255-3131. <br /> STEVE E. ROSENBAUM - <br /> Associate Engineering Geologist <br /> Enclosures <br /> cc: Mr. Jeff Hackett, California Integrated Waste Management Board, Sacramento <br />