Laserfiche WebLink
IV. BORROW STOCKPILE <br /> The stockpile of cover material is located adjacent to the proposed <br /> Winter Dump area and is adequate for site needs. To supplement this <br /> if needed, we will also receive off site fill dirt from different <br /> sources. <br /> V. -S MJ MARY <br /> This Winterization Plan is designed for seasonal operations for the <br /> 1995-96 winter. In addition, adequate drainage, refuse space, and <br /> cover material are provided to insure limited maintenance and <br /> normal operation of the landfill. <br /> Thank you, <br /> Phil Giambastiani <br /> Pres. - GAMBI ENT., INC. <br /> cc: Stephen Chen <br />