Laserfiche WebLink
46 <br /> EHD Monitoring Plan <br /> Page 2 <br /> The demonstration project will be terminated by EHD if conditions <br /> hazardous or potentially hazardous to public health and safety and <br /> the environment are observed. A return to soil daily cover will <br /> ensue. <br /> EHD Reporting: EHD will submit bimonthly reports summarizing the <br /> data collected and any other relevant observations regarding the <br /> demonstration project. A final report will be submitted at project <br /> end containing all bimonthly reports and a tabulation and analysis <br /> of all data and a conclusion as to the suitability of the material <br /> to be used as daily cover. An RDSI will be submitted in the event <br /> the GWADC is approved and the operator wishes to continue the use. <br />