Laserfiche WebLink
SECTION 2-SITE OPERATIONS PLAN Page 2-24 0 <br /> 2.4.2 Leachate Collection System Maintenance <br /> The leachate collection system will be periodically inspected to ensure that the collection lines are <br /> operating properly. When required, the pipes will be unclogged and cleaned. All collection lines <br /> provided with cleanouts will be cleaned at least once per year. Cleaning will typically consist of <br /> flushing the lines, or use of sewer cleaning equipment if necessary. Collection line clean-outs and <br /> manholes will be used to access the lines for this pericdic inspection and cleaning. For more <br /> details, see the discussion under Leachate Control in Section 1.3, above. <br /> 2.4.3 Road Maintenance <br /> The entrance road and all (in use) access roads to the landfill will be periodically inspected to <br /> ensure that they are free from obstructions, pot-holes, subsidence and erosion, mud, dust, and <br /> are clearly sign-posted. <br /> 2.4.4 Gas Monitoring System Maintenance <br /> Maintenance of the landfill gas system is discussed in the environmental monitoring section. <br /> 2.4.5 Inspection Forms <br /> Tables 2-4 and 2-5 show an example inspection form and inspection guidance form that may be <br /> used to facilitate the periodic landfill inspections. <br /> R.W.Ba"ana Associates My of Stockton <br /> 1811.12 <br />