Laserfiche WebLink
Page 2-25 SECTION 2-SITE OPERATIONS PLAN <br /> Table 2-4 <br /> CITY OF STOCKTON <br /> AUSTIN ROAD LANDFILL <br /> EXAMPLE LANDFILL INSPECTION FORM <br /> DA =: TIME: INSPECTOR: <br /> Last <br /> Description Inspection Interval Inspection Pass Fail"t <br /> Surface Drainage Facilities <br /> Drainage ditches and culverts Weekly <br /> E.--.cion Weekly <br /> In` tration and sedimentation basins Weekly <br /> Berms Monthly <br /> Landfill Operations <br /> Da:.y cover Weekly <br /> L`-ar control Weekly <br /> S:cc:cpile Weekly <br /> Landfill operations road Weekly <br /> Imarim cover Weekly <br /> F;nal cover Weekly <br /> Site Operations <br /> Sirs attendant facilities ( Weekly <br /> Sea gull control Weekly <br /> Recent and burrowing animal control Weekly <br /> Ocor Weekly <br /> Nc:se Weekly <br /> Dist Weekly <br /> Entrance and primary road net Weekly <br /> Perimeter road Monthly <br /> Perimeter fence Monthly <br /> Maintenance building- Weekly <br /> Administration (scale house) building Weekly <br /> S::riey markers Quarterly <br /> Leachate Facility <br /> Leachate lagoons I Weekly <br /> C;?-rifiers and sludge tanks Weekly <br /> D=-Watering building Weekly <br /> P:.n1p stations/pipeline Weekly <br /> Gas Collection and Control <br /> Gas collection lines Weekly <br /> Gas control system ( Weekly <br /> Condensate system ( Weekly <br /> C y of S:.:.mn R.W.Beck and Associates <br /> 1811.002 <br />