Laserfiche WebLink
SECTION 2-SITE OPERATIONS PLAN Page 2-30 <br /> 2.5 PERSONNEL AND EQUIPMENT <br /> Estimated equipment requirements are shown in Table 2-6. This equipment list assumes that, <br /> in terms of equipment requirements,the initial operation of the expanded Austin Road Landfill will <br /> be equivalent to the current operation levels and be conducted by the current operator. <br /> Table 2-6 <br /> ESTIMATED EQUIPMENT REQUIREMENTS <br /> Equipment Model Quantity <br /> Bulldozer Cat D8-36A I <br /> Scraper Cat 613 1 <br /> Scraper Cat 633 1 <br /> Compactor Cat 826 C 1 <br /> Loader Cat 983 1 <br /> Tanker 1,500 gal 1 <br /> =Tractor — I *I <br /> Estimated personnel requirements are shown it Table 2-7. This personnel list assumes that, in <br /> terms of personnel requirements, leachate haul will be contracted and the initial Austin Road <br /> Landfill expansion operation will be equivalent to the current operation levels (i.e. the operation <br /> of the leachate, landfill gas, and storm water control system are incidental to the main landfilling <br /> operation) and should not require additional personnel. <br /> Table 2-7 <br /> ESTIMATED PERSONNEL REQUIREMENTS <br /> Job Title Number <br /> Operation Manager I <br /> Crew Supervisor I <br /> Equipment Operator 1 <br /> Truck Driver I <br /> Site Attendant 1 <br /> Maintenance Worker 1 <br /> Laborer I <br /> TOTAL PERSONNEL--I 7 <br /> FL W.Becr and Associates City of Stockton <br /> 1811.002 <br />